ASTA: Difference between revisions

From Rsewiki
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:




=Autonomous Systems Test Arena=
=Autonomous Systems Test Arena (building 330D)=


Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Line 9: Line 9:
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]


===Plan===
===Status===


22 February 2021:  
28 June 2021:  
Fully operational, but work in progress with:
Fully operational (:D)
* Card access control.
* Reservation through room booking


=== Instructions ===
=== Instructions ===
Line 31: Line 29:


* [[Building history]] - pictures from process
* [[Building history]] - pictures from process
* [[Fence blocks]] - former Autonomous Eco-car fence
* [[Drone net]] - drone net mounting


===Maintainer===
===Maintainer===


This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)

Latest revision as of 14:03, 2 March 2023



Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Status

28 June 2021: Fully operational (:D)

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)