ASTA: Difference between revisions
From Rsewiki
(→Plan) |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
===Status=== | ===Status=== | ||
28 June 2021: | |||
Fully operational | Fully operational (:D) | ||
=== Instructions === | === Instructions === | ||
Line 30: | Line 29: | ||
* [[Building history]] - pictures from process | * [[Building history]] - pictures from process | ||
===Maintainer=== | ===Maintainer=== | ||
This page is (mainly) maintained by Christian Andersen ( | This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk) |
Revision as of 13:03, 2 March 2023
Autonomous Systems Test Arena (building 330D)
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Status
28 June 2021: Fully operational (:D)
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA motion capture - instructions for use
- ASTA booking - instructions for booking.
ASTA insides
- View to ASTA (must be on local net (10.59.8/9.x) to work)
- Building history - pictures from process
Maintainer
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)