ASTA: Difference between revisions

From Rsewiki
No edit summary
 
(173 intermediate revisions by 2 users not shown)
Line 1: Line 1:




[[File:die_asta.png | 200px]] (jyllands-posten.dk)


=Autonomous Systems Test Arena=


Our new facility for cooperating autonomous systems - in air, on the ground, on water and below water.
=Autonomous Systems Test Arena (building 330D)=


Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.


[[File:artist-impression.png | 600px]]
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
[[File:asta_as_of_8_nov_2019.jpg | 500px]]


Rambøl - expected view of building from the south and current view (8 Nov 2019).
===Status===


* [[Fence blocks]] - former Autonomous Eco-car fence
28 June 2021:
Fully operational.


===Sketch of building 330D ===
Official homepage: https://asta.dtu.dk/


[[File:ASTA-onshape-drawing_02.png | 400px]]
Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf


[[File:ASTA-overview-21-oct-2019.png | 400px]]
DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena


Overall sketch of the facility, an air dome, about 23 x 40m with a roof height of 14m.
=== Instructions ===
The dome is divided into 3 sections with drone (removable) net. In one end is a pool 3.3 x 6.5 x 3m and in the same area a camera localization system for accurate ground truth localization.


=== Current state ===
* [[ASTA access]] - instruction for access


* [[ASTA pool]] - instructions for pool use and maintenance.


[[File:fundament_23oct2019.png | 400px]]
* [[ASTA motion capture]] - instructions for use


as of 23 October 2019. Edge foundation started.
* [[ASTA booking]] - instructions for booking.


[[File:asta_as_of_4_nov_2019.png | 400px]]
=== ASTA insides ===


as of 4 November 2019. The first level of concrete in place.
* Looking [http://10.59.9.201:7123 South] [http://10.59.9.238:8080/?action=stream West] [http://10.59.9.222:8080/?action=stream North]  (works on local net (10.59.8/9.x) only)


[[File:asta_as_of_8_nov_2019_before_pool.jpg | 400px]]
* [[Building history]] - pictures from process


As of 8 nov 2019. Concrete form for foundation cast in place. This is the corner, where the pool is to be placed.
===Maintainer===


[[File:asta_as_of_11_nov_2019.jpg | 400px]]
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)
 
As of 11 nov 2019. The final height of foundation being marked and in-door floor levelling (before asphalt) - except for pool area (upper left).
 
Foundation concrete cast planned for Wednesday 13 nov.
 
Then the pool preparation is next.
 
After that the indoor asphalt and foundation for entrance, gate and emergency exits.
 
Dome delivery and mounting in January 2019.
 
Dome inflation and in-door preparation in February 2020.

Latest revision as of 11:59, 7 July 2025



Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Status

28 June 2021: Fully operational.

Official homepage: https://asta.dtu.dk/

Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf

DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)