=Autonomous Systems Test Arena=


Our new facility for cooperating autonomous systems - in air, on the ground, on water and below water.
=Autonomous Systems Test Arena (building 330D)=


Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.


[[File:artist-impression.png | 600px]]
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]]
[[File:asta_as_of_8_nov_2019.jpg | 500px]]


Rambøl - expected view of building from the south and current view (8 Nov 2019).
===Status===


=== Sub-pages===
28 June 2021:
Fully operational.


* [[Fence blocks]] - former Autonomous Eco-car fence
Official homepage: https://asta.dtu.dk/


===Sketch of building 330D ===
Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf


[[File:ASTA-onshape-drawing_02.png | 400px]]
DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena


[[File:ASTA-overview-21-oct-2019.png | 400px]]
=== Instructions ===


Overall sketch of the facility, an air dome, about 23 x 40m with a roof height of 14m.
* [[ASTA access]] - instruction for access
The dome is divided into 3 sections with drone (removable) net. In one end is a pool 3.3 x 6.5 x 3m deep and in the same area a camera localization system for accurate ground truth localization.


=== Current state ===
* [[ASTA pool]] - instructions for pool use and maintenance.


* [[ASTA motion capture]] - instructions for use


[[File:fundament_23oct2019.png | 400px]]
* [[ASTA booking]] - instructions for booking.


as of 23 October 2019. Edge foundation started.
=== ASTA insides ===


[[File:asta_as_of_4_nov_2019.png | 400px]]
* Looking [http://10.59.9.201:7123 South] [http://10.59.9.238:8080/?action=stream West] [http://10.59.9.222:8080/?action=stream North] (works on local net (10.59.8/9.x) only)


as of 4 November 2019. The first level of concrete in place.
* [[Building history]] - pictures from process


[[File:asta_as_of_8_nov_2019_before_pool.jpg | 400px]]
===Maintainer===


As of 8 nov 2019. Concrete form for foundation cast in place. This is the corner, where the pool is to be placed.
This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)
 
[[File:asta_as_of_11_nov_2019.jpg | 400px]]
 
As of 11 nov 2019. The final height of foundation being marked and in-door floor levelling in the background (before asphalt) - except for pool area (upper left).
 
Foundation concrete cast planned for Wednesday 13 nov.
 
Then the pool preparation is next.
 
After that the indoor asphalt and foundation for entrance, gate and emergency exits.
 
Dome delivery and mounting in January 2019.
 
Dome inflation and in-door preparation in February 2020.

Latest revision as of 11:59, 7 July 2025



Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Status

28 June 2021: Fully operational.

Official homepage: https://asta.dtu.dk/

Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf

DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)