ASTA: Difference between revisions

From Rsewiki
No edit summary
Line 11: Line 11:


Rambøl - expected view of building from the south - operational September 2020.
Rambøl - expected view of building from the south - operational September 2020.
===Plan===
15 June to XXX):
* Termination of power, network and access control.
* Finalize installation of office cabin, storage, pool and camera truss.
* Grand opening - September


=== Instructions ===
=== Instructions ===
Line 21: Line 29:


=== ASTA insides ===
=== ASTA insides ===
* [[Building history]] - pictures from process


* [[Fence blocks]] - former Autonomous Eco-car fence
* [[Fence blocks]] - former Autonomous Eco-car fence


* [[Drone net]] - drone net mounting
* [[Drone net]] - drone net mounting
* [[Building history]] - pictures from process


=====Maintainer=====
=====Maintainer=====


This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)

Revision as of 08:53, 18 June 2020



Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.


Rambøl - expected view of building from the south - operational September 2020.

Plan

15 June to XXX):

* Termination of power, network and access control.
* Finalize installation of office cabin, storage, pool and camera truss.
* Grand opening - September


Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)