Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on ground, on water and below water.
Rambøl - expected view of building from south.
Sketch of building 330D
Overall sketch of facility, an air dome, about 23 x 40m with a roof height of 14m. The dome is divided into 3 sections with drone (removeable) net. In one end is a pool 3.3 x 6.5 x 3m and in the same area a camera localization system for accurate ground truth localization.
Current state
Expected finalized in February 2020.
as of 23 October 2019.
as of 4 November 2019