Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on ground, on water and below water.


Rambøl - expected view of building from south.

Sketch of building 330D

Overall sketch of facility, an air dome, about 23 x 40m with a roof height of 14m. The dome is divided into 3 sections with drone (removeable) net. In one end is a pool 3.3 x 6.5 x 3m and in the same area a camera localization system for accurate ground truth localization.

Current state

Expected finalized in February 2020.