ASTA: Difference between revisions
From Rsewiki
(→Pool) |
(→Pool) |
||
Line 12: | Line 12: | ||
Rambøl - expected view of building from the south - operational September 2020. | Rambøl - expected view of building from the south - operational September 2020. | ||
=== | === Instructions === | ||
* [[ASTA access]] - instruction for access | * [[ASTA access]] - instruction for access |
Revision as of 08:38, 18 June 2020
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Rambøl - expected view of building from the south - operational September 2020.
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
- Building history - pictures from process
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)