ASTA: Difference between revisions
From Rsewiki
No edit summary |
(→Plan) |
||
Line 15: | Line 15: | ||
15 June to XXX): | 15 June to XXX): | ||
* Termination of power, network and access control. | |||
* Finalize installation of office cabin, storage, pool and camera truss. | |||
* Grand opening - September | |||
=== Instructions === | === Instructions === |
Revision as of 08:53, 18 June 2020
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Rambøl - expected view of building from the south - operational September 2020.
Plan
15 June to XXX):
- Termination of power, network and access control.
- Finalize installation of office cabin, storage, pool and camera truss.
- Grand opening - September
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)