ASTA: Difference between revisions
From Rsewiki
(→Plan) |
|||
Line 7: | Line 7: | ||
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface. | Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface. | ||
[[File:asta_as_of_06_apr_2020_1.jpg | 450px]] | |||
[[File: | |||
===Plan=== | ===Plan=== |
Revision as of 08:55, 18 June 2020
Autonomous Systems Test Arena
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Plan
15 June to XXX):
- Termination of power, network and access control.
- Finalize installation of office cabin, storage, pool and camera truss.
- Grand opening - September
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA localization system - instructions for use
ASTA insides
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)