ASTA: Difference between revisions

From Rsewiki
Line 13: Line 13:
6 July to XXX):  
6 July to XXX):  
* Termination of power, network and access control.
* Termination of power, network and access control.
* Finalize installation of pool and camera truss.
* Finalize installation of pool and camera system.
* Grand opening - September
* Grand opening - September



Revision as of 15:56, 6 July 2020



Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Plan

6 July to XXX):

  • Termination of power, network and access control.
  • Finalize installation of pool and camera system.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)