ASTA: Difference between revisions
From Rsewiki
(→Plan) |
|||
Line 3: | Line 3: | ||
=Autonomous Systems Test Arena= | =Autonomous Systems Test Arena (building 330D)= | ||
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface. | Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface. |
Revision as of 16:40, 18 June 2021
Autonomous Systems Test Arena (building 330D)
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Plan
18 June 2021: Fully operational, but work in progress with:
- Reservation through room booking (should be ready shortly)
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA motion capture - instructions for use
- ASTA booking - instructions for booking.
ASTA insides
- View to ASTA (must be on local net (10.59.8/9.x) to work)
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)