ASTA: Difference between revisions

From Rsewiki
No edit summary
Line 11: Line 11:
===Status===
===Status===


18 June 2021:  
28 June 2021:  
Fully operational, but work in progress with:
Fully operational (:D)
* Reservation through room booking (should be ready shortly)


=== Instructions ===
=== Instructions ===

Revision as of 14:59, 28 June 2021



Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Status

28 June 2021: Fully operational (:D)

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)