ASTA: Difference between revisions
From Rsewiki
(→Plan) |
No edit summary |
||
Line 11: | Line 11: | ||
===Status=== | ===Status=== | ||
28 June 2021: | |||
Fully operational | Fully operational (:D) | ||
=== Instructions === | === Instructions === |
Revision as of 14:59, 28 June 2021
Autonomous Systems Test Arena (building 330D)
Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.
Status
28 June 2021: Fully operational (:D)
Instructions
- ASTA access - instruction for access
- ASTA pool - instructions for pool use and maintenance.
- ASTA motion capture - instructions for use
- ASTA booking - instructions for booking.
ASTA insides
- View to ASTA (must be on local net (10.59.8/9.x) to work)
- Building history - pictures from process
- Fence blocks - former Autonomous Eco-car fence
- Drone net - drone net mounting
Maintainer
This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)