ASTA: Difference between revisions

From Rsewiki
Line 17: Line 17:


Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf
Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf
DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena


=== Instructions ===
=== Instructions ===

Revision as of 13:09, 14 May 2025



Autonomous Systems Test Arena (building 330D)

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Status

28 June 2021: Fully operational.

Official homepage: https://asta.dtu.dk/

Guidance for use: https://asta.dtu.dk/-/media/subsites/asta/documents/guidelines-and-instructions-for-using-asta-30-07-2024.pdf

DTU Electro page: https://electro.dtu.dk/research/research-facilities/autonomous-systems-test-arena

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jcan@dtu.dk)