Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Plan

6 July to XXX):

  • Termination of power, network and access control.
  • Finalize installation of pool and camera truss.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.