ASTA

From Rsewiki
Revision as of 09:42, 13 July 2020 by Jca (talk | contribs) (→‎Plan)



Autonomous Systems Test Arena

Our new facility for cooperating autonomous systems - in air, on the ground, on water and below the water surface.

Plan

6 July 2020 to XXX):

  • Termination of power, network and access control.
  • Finalize installation of pool and camera system.
  • Grand opening - September

Instructions

  • ASTA pool - instructions for pool use and maintenance.

ASTA insides

Maintainer

This page is (mainly) maintained by Christian Andersen (jca@elektro.dtu.dk)